As a room addition contractor in Beverly Hills, the first thing we do is work out how much the lot will still allow. Many homes here have already been expanded once, sometimes twice, and the city's floor area limits, setbacks and design review all shape what comes next. Once that number is clear, the conversation moves to where the new space goes and how to make it look like it was always there.

Mr Build Co. has designed and built home additions since 1984. We handle plans, engineering, city approvals and construction under one contract.

Room additions in Beverly Hills, neighborhood by neighborhood

The Flats

Most homes between Santa Monica Boulevard and Sunset are already two stories, so additions here are usually rear wings, primary suites over a garage connection or expansions into a side yard. The street facade is rarely touched, which keeps design review simpler.

South of Wilshire

Lots are smaller and many homes are one story, which makes second-story additions the common route. Upper-floor setbacks and height limits decide how big the new floor can be, and neighbors' privacy affects window placement.

Trousdale Estates

Single-story limits and view protection generally rule out building up. Additions go outward into the yard or down into a basement, and roof height and pitch must stay within the neighborhood's standards.

Hillside lots

Additions on slopes may need new retaining walls, caissons or grade beams, and fire-zone construction. Sometimes the best place for new space is under an existing deck or over a lower level.

Ground-floor primary suite addition opening to the garden of a Trousdale Estates midcentury home

The additions Beverly Hills homeowners ask for most

  • Primary suites. A bedroom, bath and dressing room on the ground floor, often for owners planning to stay long term. Our article on primary suite addition costs explains what drives the budget.
  • Second-story additions. New bedrooms over a one-story house, with a stair that has to fit somewhere sensible in the existing plan.
  • Bump-outs. A few feet added to a kitchen, family room or bathroom without a full wing. They are small in area but still involve foundation, roof and wall tie-ins.
  • Family rooms and home offices. Rear additions that open to the garden, often with large sliding or folding doors.

Making the addition look original

An addition in Beverly Hills is judged by how well it matches. On a Spanish Colonial that means smooth plaster, matching clay roof tile, deep window reveals and the same window pattern. On a Tudor it can mean half-timbering and steep roof pitches. On a midcentury home, it means continuing the roof plane, the beam spacing and the floor-to-ceiling glass.

Inside, floor heights have to line up, ceiling heights should feel consistent and the new rooms should read as part of the house. We work this out in the design phase because changing a roof line or window size later can mean going back to the city.

Approvals and structure

Additions are reviewed by the City of Beverly Hills Community Development Department. The Planning Division looks at floor area, setbacks, height and, for most exterior changes, design. Building and Safety reviews the structural, energy and systems drawings. Some homes with a Beverly Hills address are in the City of Los Angeles, so we confirm jurisdiction first.

We also pull the permit history. Past additions, enclosed porches and converted garages that were never permitted count against your floor area in practice and can surface during plan check. Finding them early lets us decide whether to legalize, remove or work around them before the new design depends on that space.

Structurally, every addition has to tie into the existing house. A second story usually needs new footings, strengthened walls and new shear walls and hold-downs. A rear wing needs a foundation that matches the existing floor height. When the addition triggers energy code compliance for the new space, insulation, windows and HVAC are designed to meet it.

Framing for a rear bump-out family room addition on a Beverly Hills house south of Wilshire

Cost drivers for a Beverly Hills room addition

  • Going up versus out: second stories carry structural reinforcement below.
  • Foundation conditions, soil, slope and any retaining walls.
  • Plumbing: a new bathroom far from existing lines costs more.
  • HVAC capacity: whether the current system can serve the new rooms.
  • Matching exterior materials, such as clay tile, steel windows or custom plaster.
  • Design review changes that affect massing or materials.
  • Interior updates to the existing house where the addition connects.

Timeline factors and living at home

The longest stretch before construction is usually design review and plan check. Once building starts, foundations, framing, roofing, rough systems, inspections and finishes follow in that order. A ground-floor addition can often be built while you stay home, with the opening to the existing house made late in the job. A second story usually means moving out for part of the work. Our guide to living in your home during a remodel covers how to plan for it.

Custom windows and roof tile that must match the original house are often the longest lead items. We order them as soon as plan check is far enough along that sizes will not change, so the shell can be closed in before the rainy season if timing allows.

What Mr Build handles

We take care of feasibility, floor area calculations, design, drawings, engineering through our partners, design review submittals, permits, construction and final inspection. If you are deciding between expanding the house and building a separate unit, read ADU versus home addition, then see our ADUs and additions page. For projects that combine an addition with a kitchen or bath remodel, our general contractor services in Beverly Hills explain how one team coordinates it all.

We run every addition through five steps: consultation, design and permits, selections, construction and final walkthrough, with a dedicated project manager and a fixed written scope.

Our process

How a project with Mr Build works

Five steps, one team and one point of contact from the first visit to the final walkthrough.

  1. Consultation

    We meet at your home, walk the space, and talk through goals, priorities and budget before anything is drawn.

  2. Design & Permits

    Plans, engineering and energy calculations are prepared and submitted, and we handle plan-check corrections with the city.

  3. Selections

    You choose finishes, fixtures and materials with our guidance, so long-lead items are ordered before they can hold up the schedule.

  4. Construction

    A dedicated project manager runs the trades, inspections and schedule, with regular updates so you always know what's next.

  5. Final Walkthrough

    We walk every room with you, finish the punch list, close out the permit, and hand over warranties and manuals.

Client reviews

What our clients say

★★★★★

“We worked with Mr Build to construct an ADU on our property. Their team guided us through the planning and construction process, stayed organized, and delivered a beautiful space that feels like part of the home.”

Amanda C.Tarzana, CA
★★★★★

“Mr Build transformed our outdated kitchen into a beautiful, functional space. The team was professional, organized, and kept us updated throughout the project. The finished kitchen exceeded our expectations.”

Jennifer L.Los Angeles, CA
★★★★★

“We hired Mr Build for our bathroom remodel and couldn't be happier with the results. They helped us improve the layout, choose great finishes, and completed everything with impressive attention to detail.”

David R.Encino, CA

FAQ

Room Additions in Beverly Hills: common questions

Does a room addition in Beverly Hills need design review?

Additions that change the exterior, especially second stories and additions visible from the street, typically go through the city's residential design review before building plan check. A small rear addition that follows the existing style may be reviewed at staff level. We confirm the review path with the Beverly Hills Planning Division during feasibility, before full drawings are produced.

How do I know if my house has room under the floor area limit?

Beverly Hills ties maximum floor area to lot size and applies different rules in the Flats, Trousdale and the hillside area. We measure the existing house, check permit records for past additions and calculate what remains. Some homes are already near the limit, which changes the conversation toward reconfiguring space, adding a basement or building an ADU instead.

Can I add a second story to a one-story Beverly Hills home?

On many lots in the Flats and south of Wilshire, yes, within height and setback limits and subject to design review. The existing foundation and walls usually need strengthening to carry the new floor, and an engineer designs a new load path. In Trousdale Estates, single-story limits generally rule out a second floor, so additions there go outward.

Can we live in the house during a Beverly Hills room addition?

Often for a ground-floor addition, with the new space sealed off until it is tied in. A second-story addition usually means moving out for part of the work, because the roof comes off and the floor below is opened for structure. We plan the phasing with you so you know which weeks the house is livable.

Is an addition or an ADU better for my Beverly Hills property?

It depends on how you will use the space. An addition expands the main home and counts toward its floor area. An ADU is a separate dwelling with its own entry and kitchen, follows state ADU rules and usually gets ministerial approval. If the goal is a suite for a parent or adult child, compare both options before choosing.

From the blog

Helpful reading

Free estimate

Let's talk about your home

Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.

  • On-site visit with an experienced builder
  • Clear written scope and pricing
  • Design, engineering and permits handled for you

Prefer to call? 888-792-8453

Get Free Estimate

We reply within one business day. No obligation.
Call nowGet Free Estimate