888-792-8453Monday–Friday, 9am–6pm · CA License #439166
Get Free Estimate
Remodeled Los Angeles kitchen with white oak cabinets, a quartz island and pendant lights

Los Angeles & Orange County

Kitchen Remodeling in Los Angeles

Design, permits and construction for full kitchen remodels across Los Angeles and Orange County, planned around how you cook and priced from a fixed, written scope.

Since 1984License #4391664.9/5 client ratingDesign, permits & construction

Kitchen remodeling in Los Angeles usually starts with a specific frustration: too little counter space, a range that blocks the walkway, cabinets that waste the corners, or lighting that leaves you chopping in your own shadow. Fixing those problems well means deciding early what moves and what stays, because moving a sink, a gas line or a wall changes the permit, the schedule and the budget far more than any finish choice.

Mr Build Co. is a design-build contractor that has remodeled homes across Los Angeles and Orange County since 1984. We handle design, plans, permits and construction under one fixed, written scope, so you know exactly what is included before demolition starts. Below is how a full kitchen remodel works, the decisions you will make, and what to expect at each phase.

What a Full Kitchen Remodel Includes

A complete kitchen remodel touches nearly every trade in the house. A typical scope covers:

  • Design and drawings: site measurements, a floor plan, elevations of each wall of cabinets, and a lighting and electrical plan.
  • Protection and demolition: dust barriers, floor protection along the work path, and careful removal of cabinets, counters, flooring and drywall where needed.
  • Framing changes: opening or removing walls, adding a beam where a wall is load-bearing, and building out soffits or pantry walls.
  • Plumbing and gas: relocated or new sink drains and supply lines, a pot filler, a refrigerator water line, and gas lines sized for the new range.
  • Electrical: new appliance and countertop circuits, recessed and under-cabinet lighting, island outlets, and a panel evaluation.
  • Ventilation: a range hood ducted to the exterior, with the duct route planned before cabinets are ordered.
  • Cabinets, countertops and backsplash: installation, templating, fabrication and tile.
  • Flooring, drywall, paint and trim, followed by appliance installation, inspections and a final walkthrough.

Not every kitchen needs all of this. If your layout already works, a smaller scope such as new cabinets and counters in the same footprint can deliver much of the improvement with less time and permitting.

Kitchen under construction with new electrical boxes and plumbing rough-in for a relocated sink

Layout, Cabinet and Countertop Choices

Layout

Most kitchens fall into a few patterns: galley, L-shape, U-shape, or one of these with an island or peninsula. Our guide to common kitchen layout types walks through the tradeoffs. The numbers that matter most are aisle widths: about 42 inches works for one cook and 48 inches for two. Opening the kitchen to the family room is a popular request, and the first question is whether the wall carries load from the roof or a floor above. If it does, it can still come out, but a beam, posts and sometimes new footings are needed.

Cabinets

Stock cabinets come in fixed sizes and ship fastest. Semi-custom lines offer more sizes, finishes and interior options. Custom cabinets are built to your exact dimensions, which matters in older Los Angeles homes where walls are rarely square. You will also choose between face-frame and frameless boxes, and how much of the lower storage should be drawers rather than doors. Deep drawers for pots are usually the most appreciated upgrade.

Countertops

Quartz is consistent and low-maintenance. Granite and quartzite handle heat well and give each kitchen its own pattern. Marble is softer and etches from acids. Porcelain slabs are thin, heat-resistant and work for waterfall ends. Counters are templated only after the cabinets are installed, so the slab fits the real boxes rather than the drawing.

Lighting and appliances

Good kitchen lighting comes in layers: recessed or surface fixtures for general light, under-cabinet strips over the work surfaces, and pendants over the island. California's Title 24 energy code requires high-efficacy fixtures and specific controls for new and altered lighting, and the inspector checks them. Choose appliances before cabinets are finalized, because a 36-inch or 48-inch range, a panel-ready refrigerator or a wall oven stack changes the cabinet layout. A very powerful range hood can also trigger makeup-air requirements, which is better known during design than at inspection.

Moving Plumbing, Gas and Electrical in an Older Home

Relocating the sink is common, and how hard it is depends on the foundation. In a house with a raised foundation and a crawlspace, new drain lines run under the floor with modest effort. On a concrete slab, the slab has to be cut and trenched, and the new drain needs proper slope and venting. An island sink needs a venting solution the inspector will accept, which we work out on paper first.

Gas lines must be sized for the total load of your appliances, so a professional range with high-output burners may need a larger line from the meter. Electrical work follows the California Electrical Code: dedicated small-appliance circuits on the counters, ground-fault protection, and outlets spaced so no point along the counter is too far from one. Many older Los Angeles homes still have 100-amp panels or less. Adding induction cooking, a second oven, an EV charger or a heat pump can push a panel past its capacity, and a service upgrade means coordinating with LADWP or Southern California Edison, depending on where you live.

What Drives Kitchen Remodeling Cost in Los Angeles

We price every project from a detailed written scope, so the number reflects your kitchen rather than an average. These are the choices and conditions that move a kitchen budget the most:

  1. Layout changes. Moving the sink, range or a wall brings plumbing, gas, electrical, structural and permit work with it.
  2. Cabinet construction. Stock, semi-custom and custom lines differ widely, as do interior fittings like pull-outs and organizers.
  3. Countertop material and fabrication. Slab count, edge profiles, waterfall ends and the number of cutouts all add up.
  4. The appliance package. High-end ranges often need a bigger gas line, a larger hood and sometimes makeup air.
  5. Electrical service. A panel or service upgrade is a separate line item with its own utility coordination.
  6. What is behind the walls. Older homes can hide knob-and-tube wiring, galvanized pipe, termite damage, or asbestos in old flooring and mastic. Homes built before 1978 may have lead paint, which requires lead-safe work practices.
  7. Size and finish detail. Ceiling height, full-height backsplash tile and custom range hoods add labor.
Finished kitchen with an induction cooktop, ducted range hood and under-cabinet lighting

Kitchen Remodel Permits in Los Angeles and Orange County

In the City of Los Angeles, including Brentwood, Encino and Pacific Palisades, permits come from LADBS, the Los Angeles Department of Building and Safety. Replacing cabinets and counters in place often needs no permit. New circuits, relocated plumbing or gas, new windows and wall changes do. Simple non-structural work can often be permitted quickly, while removing a bearing wall needs structural drawings and plan check. Our article on permits for a kitchen remodel in Los Angeles covers the details.

Outside the City of LA, each city runs its own building department. Beverly Hills, West Hollywood and Manhattan Beach on the Westside, and Irvine, Costa Mesa, Santa Ana, Newport Beach and Huntington Beach in Orange County, each have their own submittal rules and inspection schedules. Many Orange County communities also have HOAs that set work hours, require contractor insurance documents, or review exterior changes such as a new window. We confirm these requirements for your address and handle the submittals.

Kitchen Remodel Timeline by Phase

Durations below are typical for a full kitchen remodel. Permit time depends on whether plan check is required.

PhaseTypical durationWhat happens
Consultation and measuring1–2 weeksOn-site visit, goals, existing conditions, rough scope
Design and selections3–6 weeksLayout, cabinet drawings, lighting plan, appliances, finishes, fixed price
Permits and ordering1–8 weeksPermit submittal; cabinets and appliances ordered so they arrive on time
Demolition and rough-in1–3 weeksRemoval, framing, plumbing, gas, electrical, rough inspections
Walls and cabinets2–3 weeksInsulation, drywall, flooring, cabinet installation
Countertops and finishes2–4 weeksTemplate, fabrication, backsplash, appliances, paint, final inspection, walkthrough

Construction for a full remodel usually runs six to twelve weeks. Our kitchen remodel timeline guide explains where delays usually come from.

Common Kitchen Remodeling Mistakes and How We Avoid Them

  • Ordering cabinets before choosing appliances. We finalize appliance specifications first, so every opening fits.
  • Starting demolition before selections are done. Waiting on a faucet or tile mid-project stops the crew. We finish selections before work begins.
  • Forgetting the hood duct route. A duct that cannot reach the outside through joists or a second floor forces a weaker hood. We plan the route during design.
  • Oversizing the island. An island that squeezes the aisles makes the kitchen harder to use. We check clearances on the drawings.
  • Treating lighting and outlets as an afterthought. We draw the lighting and electrical plan with you, including where the coffee maker and charging spot go.
  • Picking stone from a small sample. We encourage viewing full slabs before fabrication.

Why Choose a Design-Build Kitchen Contractor

With separate designers and builders, drawings are often finished before anyone prices them, and the homeowner ends up redesigning to fit the budget. In design-build, the people who draw your kitchen are working with the people who build it, so layouts are checked against real costs and site conditions from the start. You get one contract, one fixed and detailed scope, and one dedicated project manager.

Our process has five steps: a free on-site consultation, design and permits, selections, construction, and a final walkthrough. Mr Build Co. has held California contractor license #439166 for more than four decades, has transformed more than 130 homes, and holds a 4.9 out of 5 average client rating. We build kitchens throughout the region, from kitchen remodeling in Beverly Hills to kitchen remodels in Irvine and across Orange County. When you are ready, schedule your free kitchen consultation and we will walk the space with you.

Plan your project

Free on-site consultation. Clear written pricing. Design, permits and construction handled by one team.

Get Free Estimate888-792-8453

Our process

How a project with Mr Build works

Five steps, one team and one point of contact from the first visit to the final walkthrough.

  1. Consultation

    We meet at your home, walk the space, and talk through goals, priorities and budget before anything is drawn.

  2. Design & Permits

    Plans, engineering and energy calculations are prepared and submitted, and we handle plan-check corrections with the city.

  3. Selections

    You choose finishes, fixtures and materials with our guidance, so long-lead items are ordered before they can hold up the schedule.

  4. Construction

    A dedicated project manager runs the trades, inspections and schedule, with regular updates so you always know what's next.

  5. Final Walkthrough

    We walk every room with you, finish the punch list, close out the permit, and hand over warranties and manuals.

Service areas

Kitchen Remodeling across Los Angeles and Orange County

Each city has its own permit office, housing stock and rules. Pick yours for local details.

Kitchen Remodeling by city

Client reviews

What our clients say

★★★★★

“Mr Build transformed our outdated kitchen into a beautiful, functional space. The team was professional, organized, and kept us updated throughout the project. The finished kitchen exceeded our expectations.”

Jennifer L.Los Angeles, CA
★★★★★

“Our kitchen remodel with Mr Build turned out exactly how we envisioned it. They improved the storage, lighting, and overall layout while giving the space a clean, modern look. Great team to work with.”

Robert M.Calabasas, CA
★★★★★

“We hired Mr Build for our bathroom remodel and couldn't be happier with the results. They helped us improve the layout, choose great finishes, and completed everything with impressive attention to detail.”

David R.Encino, CA

FAQ

Kitchen Remodeling: frequently asked questions

How long does a kitchen remodel take in Los Angeles?

Plan on roughly two to four months from first meeting to finished kitchen. Design, selections and permits usually take four to ten weeks, and construction for a full remodel typically runs six to twelve weeks. Moving walls, waiting on plan check, or choosing custom cabinets with long lead times pushes the schedule toward the longer end.

Do I need a permit for a kitchen remodel in Los Angeles?

If you are only replacing cabinets and countertops in the same locations, often not. Once you add circuits, move plumbing or gas, change a wall, or replace a window, the City of Los Angeles requires a permit from LADBS, and other cities such as Beverly Hills or Irvine have their own building departments. We confirm the requirement for your address during design and pull the permits for you.

What affects the cost of a kitchen remodel the most?

Layout changes move the budget more than anything else, because relocating a sink, range or wall brings plumbing, gas, electrical, structural and permit work with it. After that, cabinet construction, countertop material and slab count, the appliance package, and the condition of the wiring and pipes behind the walls make the biggest difference.

Can I live at home during a kitchen remodel?

Most homeowners do. We seal the work area with dust barriers, protect floors on the path in and out, and help you set up a temporary kitchen with a refrigerator, microwave and a sink elsewhere in the house. Expect a few weeks without a working kitchen and a few days of noise during demolition.

Can you switch my gas range to an induction cooktop?

Yes. Induction needs a dedicated 240-volt circuit, and in older homes that can mean checking whether the electrical panel has enough capacity. We evaluate the panel during the consultation, plan the new circuit, and cap the old gas line safely if you no longer need it.

Should I choose quartz or natural stone countertops?

Quartz is consistent, low-maintenance and resists stains, which suits busy family kitchens. Natural stone such as granite or quartzite offers one-of-a-kind patterns and handles heat well, while marble is beautiful but etches from acids like lemon juice. We encourage you to view full slabs before choosing, since small samples rarely show the veining you will get.

Do you remodel kitchens in Orange County as well as Los Angeles?

Yes. Mr Build Co. remodels kitchens in Los Angeles neighborhoods such as Brentwood, Encino and Pacific Palisades and in Orange County cities including Irvine, Costa Mesa, Newport Beach and Huntington Beach. Each Orange County city has its own building department, and many communities also have HOA rules, which we account for in the schedule.

From the blog

Helpful reading

Free estimate

Let's talk about your home

Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.

  • On-site visit with an experienced builder
  • Clear written scope and pricing
  • Design, engineering and permits handled for you

Prefer to call? 888-792-8453

Get Free Estimate

We reply within one business day. No obligation.
Call nowGet Free Estimate