Kitchen remodeling in Los Angeles usually starts with a specific frustration: too little counter space, a range that blocks the walkway, cabinets that waste the corners, or lighting that leaves you chopping in your own shadow. Fixing those problems well means deciding early what moves and what stays, because moving a sink, a gas line or a wall changes the permit, the schedule and the budget far more than any finish choice.
Mr Build Co. is a design-build contractor that has remodeled homes across Los Angeles and Orange County since 1984. We handle design, plans, permits and construction under one fixed, written scope, so you know exactly what is included before demolition starts. Below is how a full kitchen remodel works, the decisions you will make, and what to expect at each phase.
What a Full Kitchen Remodel Includes
A complete kitchen remodel touches nearly every trade in the house. A typical scope covers:
- Design and drawings: site measurements, a floor plan, elevations of each wall of cabinets, and a lighting and electrical plan.
- Protection and demolition: dust barriers, floor protection along the work path, and careful removal of cabinets, counters, flooring and drywall where needed.
- Framing changes: opening or removing walls, adding a beam where a wall is load-bearing, and building out soffits or pantry walls.
- Plumbing and gas: relocated or new sink drains and supply lines, a pot filler, a refrigerator water line, and gas lines sized for the new range.
- Electrical: new appliance and countertop circuits, recessed and under-cabinet lighting, island outlets, and a panel evaluation.
- Ventilation: a range hood ducted to the exterior, with the duct route planned before cabinets are ordered.
- Cabinets, countertops and backsplash: installation, templating, fabrication and tile.
- Flooring, drywall, paint and trim, followed by appliance installation, inspections and a final walkthrough.
Not every kitchen needs all of this. If your layout already works, a smaller scope such as new cabinets and counters in the same footprint can deliver much of the improvement with less time and permitting.

Layout, Cabinet and Countertop Choices
Layout
Most kitchens fall into a few patterns: galley, L-shape, U-shape, or one of these with an island or peninsula. Our guide to common kitchen layout types walks through the tradeoffs. The numbers that matter most are aisle widths: about 42 inches works for one cook and 48 inches for two. Opening the kitchen to the family room is a popular request, and the first question is whether the wall carries load from the roof or a floor above. If it does, it can still come out, but a beam, posts and sometimes new footings are needed.
Cabinets
Stock cabinets come in fixed sizes and ship fastest. Semi-custom lines offer more sizes, finishes and interior options. Custom cabinets are built to your exact dimensions, which matters in older Los Angeles homes where walls are rarely square. You will also choose between face-frame and frameless boxes, and how much of the lower storage should be drawers rather than doors. Deep drawers for pots are usually the most appreciated upgrade.
Countertops
Quartz is consistent and low-maintenance. Granite and quartzite handle heat well and give each kitchen its own pattern. Marble is softer and etches from acids. Porcelain slabs are thin, heat-resistant and work for waterfall ends. Counters are templated only after the cabinets are installed, so the slab fits the real boxes rather than the drawing.
Lighting and appliances
Good kitchen lighting comes in layers: recessed or surface fixtures for general light, under-cabinet strips over the work surfaces, and pendants over the island. California's Title 24 energy code requires high-efficacy fixtures and specific controls for new and altered lighting, and the inspector checks them. Choose appliances before cabinets are finalized, because a 36-inch or 48-inch range, a panel-ready refrigerator or a wall oven stack changes the cabinet layout. A very powerful range hood can also trigger makeup-air requirements, which is better known during design than at inspection.
Moving Plumbing, Gas and Electrical in an Older Home
Relocating the sink is common, and how hard it is depends on the foundation. In a house with a raised foundation and a crawlspace, new drain lines run under the floor with modest effort. On a concrete slab, the slab has to be cut and trenched, and the new drain needs proper slope and venting. An island sink needs a venting solution the inspector will accept, which we work out on paper first.
Gas lines must be sized for the total load of your appliances, so a professional range with high-output burners may need a larger line from the meter. Electrical work follows the California Electrical Code: dedicated small-appliance circuits on the counters, ground-fault protection, and outlets spaced so no point along the counter is too far from one. Many older Los Angeles homes still have 100-amp panels or less. Adding induction cooking, a second oven, an EV charger or a heat pump can push a panel past its capacity, and a service upgrade means coordinating with LADWP or Southern California Edison, depending on where you live.
What Drives Kitchen Remodeling Cost in Los Angeles
We price every project from a detailed written scope, so the number reflects your kitchen rather than an average. These are the choices and conditions that move a kitchen budget the most:
- Layout changes. Moving the sink, range or a wall brings plumbing, gas, electrical, structural and permit work with it.
- Cabinet construction. Stock, semi-custom and custom lines differ widely, as do interior fittings like pull-outs and organizers.
- Countertop material and fabrication. Slab count, edge profiles, waterfall ends and the number of cutouts all add up.
- The appliance package. High-end ranges often need a bigger gas line, a larger hood and sometimes makeup air.
- Electrical service. A panel or service upgrade is a separate line item with its own utility coordination.
- What is behind the walls. Older homes can hide knob-and-tube wiring, galvanized pipe, termite damage, or asbestos in old flooring and mastic. Homes built before 1978 may have lead paint, which requires lead-safe work practices.
- Size and finish detail. Ceiling height, full-height backsplash tile and custom range hoods add labor.

Kitchen Remodel Permits in Los Angeles and Orange County
In the City of Los Angeles, including Brentwood, Encino and Pacific Palisades, permits come from LADBS, the Los Angeles Department of Building and Safety. Replacing cabinets and counters in place often needs no permit. New circuits, relocated plumbing or gas, new windows and wall changes do. Simple non-structural work can often be permitted quickly, while removing a bearing wall needs structural drawings and plan check. Our article on permits for a kitchen remodel in Los Angeles covers the details.
Outside the City of LA, each city runs its own building department. Beverly Hills, West Hollywood and Manhattan Beach on the Westside, and Irvine, Costa Mesa, Santa Ana, Newport Beach and Huntington Beach in Orange County, each have their own submittal rules and inspection schedules. Many Orange County communities also have HOAs that set work hours, require contractor insurance documents, or review exterior changes such as a new window. We confirm these requirements for your address and handle the submittals.
Kitchen Remodel Timeline by Phase
Durations below are typical for a full kitchen remodel. Permit time depends on whether plan check is required.
| Phase | Typical duration | What happens |
|---|---|---|
| Consultation and measuring | 1–2 weeks | On-site visit, goals, existing conditions, rough scope |
| Design and selections | 3–6 weeks | Layout, cabinet drawings, lighting plan, appliances, finishes, fixed price |
| Permits and ordering | 1–8 weeks | Permit submittal; cabinets and appliances ordered so they arrive on time |
| Demolition and rough-in | 1–3 weeks | Removal, framing, plumbing, gas, electrical, rough inspections |
| Walls and cabinets | 2–3 weeks | Insulation, drywall, flooring, cabinet installation |
| Countertops and finishes | 2–4 weeks | Template, fabrication, backsplash, appliances, paint, final inspection, walkthrough |
Construction for a full remodel usually runs six to twelve weeks. Our kitchen remodel timeline guide explains where delays usually come from.
Common Kitchen Remodeling Mistakes and How We Avoid Them
- Ordering cabinets before choosing appliances. We finalize appliance specifications first, so every opening fits.
- Starting demolition before selections are done. Waiting on a faucet or tile mid-project stops the crew. We finish selections before work begins.
- Forgetting the hood duct route. A duct that cannot reach the outside through joists or a second floor forces a weaker hood. We plan the route during design.
- Oversizing the island. An island that squeezes the aisles makes the kitchen harder to use. We check clearances on the drawings.
- Treating lighting and outlets as an afterthought. We draw the lighting and electrical plan with you, including where the coffee maker and charging spot go.
- Picking stone from a small sample. We encourage viewing full slabs before fabrication.
Why Choose a Design-Build Kitchen Contractor
With separate designers and builders, drawings are often finished before anyone prices them, and the homeowner ends up redesigning to fit the budget. In design-build, the people who draw your kitchen are working with the people who build it, so layouts are checked against real costs and site conditions from the start. You get one contract, one fixed and detailed scope, and one dedicated project manager.
Our process has five steps: a free on-site consultation, design and permits, selections, construction, and a final walkthrough. Mr Build Co. has held California contractor license #439166 for more than four decades, has transformed more than 130 homes, and holds a 4.9 out of 5 average client rating. We build kitchens throughout the region, from kitchen remodeling in Beverly Hills to kitchen remodels in Irvine and across Orange County. When you are ready, schedule your free kitchen consultation and we will walk the space with you.