As a demolition and rebuild contractor in Los Angeles, we often meet homeowners who started out planning a remodel and found that the existing house was working against them: a cracked foundation, termite-damaged framing, eight-foot ceilings and a layout that would need nearly every wall moved. At that point, tearing down and building new can cost about the same as a deep remodel and give you a far better house.
Mr Build Co. is a design-build general contractor in business since 1984. We manage the whole sequence for you: the tear-down decision, surveys, demolition permits, utility disconnects, demolition, design, engineering and construction of the new home, all under one fixed, written scope with a dedicated project manager.
What a Demolition and Rebuild Includes
- Feasibility: zoning review, survey, soils, utilities, and a remodel-versus-rebuild comparison.
- Design and engineering for the new home, including structural, civil, energy and fire sprinkler design.
- Pre-demolition surveys: asbestos and lead testing, and abatement by licensed specialists where needed.
- Utility disconnects: gas meter removal, electric service disconnection, water shutoff and sewer capping.
- Demolition permit and demolition: removal of the house, foundation, hardscape and any accessory structures, with debris sorted for recycling.
- Site preparation: grading, compaction, retaining walls, drainage and new utility trenches.
- Construction of the new home from foundation through finishes, inspections and final walkthrough.

When to Tear Down vs. Remodel
There is no single rule, but these signs point toward a rebuild:
- The foundation is cracked, settling or undersized for the house you want.
- Termite damage, dry rot or past water damage has spread through the framing.
- You would be replacing the roof, windows, plumbing, wiring and HVAC anyway.
- The layout would need most interior walls moved and ceilings raised.
- You want a second story the existing structure cannot support without major reinforcement.
There are also reasons to keep the existing house. Older homes sometimes sit closer to property lines or exceed today's floor area limits, and those conditions are usually allowed to remain only while the structure does. A home in a Historic Preservation Overlay Zone, or one that may be historic, can face added review before demolition. In some cities, removing enough of a house during a remodel causes the project to be treated as new construction. We review these issues during feasibility and give you a side-by-side comparison before you decide.
Before Demolition: Surveys, Permits and Utility Disconnects
Asbestos and lead
Homes built before the 1980s often contain asbestos in popcorn ceilings, vinyl flooring, mastic, duct wrap, plaster or stucco. The South Coast Air Quality Management District has rules for asbestos surveys and notification before demolition, and cities typically want proof of compliance before issuing a demolition permit. Asbestos found in the survey is removed by a licensed abatement contractor first. Homes built before 1978 may also have lead paint, which requires lead-safe practices.
Utility disconnects
Before demolition, the gas company removes the meter, the electric utility disconnects service, water is shut off or reduced to a construction line, and the sewer lateral is capped and inspected. In the City of Los Angeles, electric service usually comes from LADWP; in much of the rest of the region it is Southern California Edison. Scheduling these early prevents a demolition crew from waiting on a utility.
Demolition permits
In the City of Los Angeles, including Brentwood, Encino and Pacific Palisades, demolition permits are issued by LADBS, with LA City Planning involved for zoning and historic questions. Beverly Hills, West Hollywood and Manhattan Beach have their own departments, as do Irvine, Costa Mesa, Santa Ana, Newport Beach and Huntington Beach. Many cities also require a share of demolition debris to be recycled and some require an approved hauler. On hillside lots, large soil export can require haul route approval; our article on grading permits in Los Angeles covers the basics.
Pacific Palisades fire rebuilds
The January 2025 Palisades Fire destroyed thousands of homes, and the city and state put special rules in place to help families rebuild. Those rules have changed over time, so for any Palisades rebuild we confirm the current requirements with LADBS before design and permitting begin.
The Demolition Process
- Abatement of asbestos or lead, where found.
- Salvage of anything you want to keep, such as fixtures, doors, brick or lumber.
- Site protection: fencing, dust control, erosion control and protection of trees and neighboring property.
- Structure removal, usually in one to two weeks for a typical single-family house, with materials separated for recycling.
- Foundation and hardscape removal, including footings, slabs and old utility lines.
- Grading and compaction to the soils engineer's recommendations, ready for the new foundation.
Demolition is the loudest and dustiest part of the project, so it is also when neighbors notice you most. Adjacent walls, fences and driveways should be photographed before work starts. We keep the site watered to control dust, follow local construction hours, and keep the street and sidewalk clear. On tight lots, we plan where trucks will park and load so the block stays passable.

Building the New Home
Once the lot is clear, the project follows the same path as any custom home: foundation, framing, roof, windows, rough plumbing, electrical and mechanical work, insulation, drywall and finishes. A new home must meet current codes in full. That includes the Title 24 energy code, which generally requires solar panels on new single-family homes (see our article on the California solar mandate), automatic fire sprinklers under the California Residential Code, current seismic design, and wildfire-resistant construction in Very High Fire Hazard Severity Zones.
Design starts from the current zoning envelope rather than the old footprint. Setbacks, height limits and the maximum floor area for your lot set the outer limits, and in the City of Los Angeles those floor area rules can be stricter on hillside lots. A rebuild also lets you rethink the whole lot: where the house sits for light and privacy, how the garage and driveway work, whether to add an ADU, and how the house connects to the yard.
What Drives Demolition and Rebuild Costs
We price from complete plans and a detailed written scope. The biggest factors are:
- Abatement: the amount and type of asbestos or lead found.
- Site conditions: slope, soils, retaining walls, shoring, export and access for equipment.
- Size and design complexity of the new home, including basements, large glass openings and steel.
- Utility work: a new or larger water service for sprinklers, a new electrical service, and the sewer connection.
- Finish level for kitchens, bathrooms, flooring, millwork and fixtures.
- Fees and approvals: plan check, permits, school fees and any planning, HOA or coastal review.
How the contract is structured matters as well. Our article comparing cost-plus and fixed-price contracts explains why we work from fixed, detailed scopes.
Demolition and Rebuild Timeline by Phase
| Phase | Typical duration | What happens |
|---|---|---|
| Feasibility and consultation | 2–6 weeks | Remodel-versus-rebuild review, survey, zoning envelope |
| Design and engineering | 4–8 months | New home plans, structural, civil and energy design, fixed written scope |
| Permits and approvals | 6–12+ months | Building plan check, demolition permit, HOA or coastal review |
| Surveys, abatement and disconnects | 2–6 weeks | Asbestos and lead work, utility disconnects, sewer cap |
| Demolition and site preparation | 2–6 weeks | Structure and foundation removal, grading, compaction |
| Construction of the new home | 12–18 months | Foundation through finishes, inspections, final walkthrough |
We usually wait to demolish until the new home's building permit is close to issue, so the lot does not sit empty for months.
Common Demolition and Rebuild Mistakes
- Demolishing before the new plans are approved. We sequence demolition close to the building permit.
- Losing nonconforming rights unknowingly. We check existing setbacks and floor area before you decide to tear down.
- Skipping the asbestos survey. It is required, and finding asbestos mid-demolition stops the job.
- Late utility requests. We schedule disconnects and new service applications early.
- Underestimating site work. Retaining walls, drainage and export are priced from the start.
Why Choose a Design-Build Demolition and Rebuild Contractor in Los Angeles
A rebuild involves surveyors, engineers, abatement contractors, utilities, the city and a full building crew. With design-build, one team coordinates all of it, and the new home is designed with real construction pricing from the start. You get one contract, one fixed and detailed scope, and one dedicated project manager.
Our five steps are a free on-site consultation, design and permits, selections, construction and a final walkthrough. Mr Build Co. holds California contractor license #439166, has more than 40 years in business and 130+ homes transformed, and has a 4.9 out of 5 average client rating. We manage rebuilds across the region, including demolition and rebuild in Pacific Palisades and Manhattan Beach rebuilds. Schedule a free consultation and we will help you weigh remodeling against rebuilding.