
Kitchen Remodeling in Costa Mesa
New layouts, cabinetry, counters, lighting and appliances, with the plumbing and electrical behind them.
Orange County, California
Kitchens, bathrooms, ADUs, additions and new homes for Costa Mesa's Eastside, Westside and Mesa Verde, with design, permits and construction under one contract.
Since 1984License #4391664.9/5 client ratingDesign, permits & construction
Services in Costa Mesa

New layouts, cabinetry, counters, lighting and appliances, with the plumbing and electrical behind them.

Showers, tubs, tile, vanities and ventilation, waterproofed and built to last.

Whole-house renovations that update layouts, systems and finishes in one coordinated project.

Detached and attached ADUs, garage conversions and JADUs, from feasibility to final inspection.

Primary suites, second stories and bump-outs that match the house you already have.

Ground-up homes planned around your lot, your views and the way you live.

Tear down and build new: demo permits, site prep, utilities and a home built to current code.

One licensed contractor for permits, structural work and every trade on a multi-room project.
Costa Mesa is a city of mid-century houses on good lots. Most of its single-family homes went up in the building boom after World War II, and the ranch and tract houses on the Eastside, the Westside and in Mesa Verde are now 60 or more years old. That age is what drives most remodeling and building here: kitchens and bathrooms that were never updated, systems at the end of their life, and owners who want more space without leaving the neighborhood.
Mr Build is a design-build general contractor serving Costa Mesa and the rest of Orange County. We handle design, engineering, permits and construction for remodels, additions, ADUs and new homes.
Costa Mesa's housing stock is fairly consistent, which makes projects predictable in useful ways. Many houses sit on concrete slabs, so moving plumbing means cutting concrete. Original electrical panels are usually too small for a modern kitchen or an ADU. Galvanized supply lines, cast-iron drains and older materials such as asbestos-containing flooring adhesive turn up often enough that we plan and test for them from the start.
The city has also changed quickly over the past decade. Costa Mesa has seen many lot splits and ADUs, and on larger lots, original single-story homes are being replaced with new two-story houses. That mix means a remodel next door, an ADU behind the neighbor's garage and a new home down the block are all ordinary sights.
For homeowners, the practical lesson is to plan the property as a whole. If an ADU might come later, size the electrical service and sewer line for it now. If a second story is likely in ten years, a kitchen remodel can leave room for the future stair. Thinking a step ahead costs little during design and avoids tearing out new work later.
The Eastside, closer to Newport Beach, has larger lots on average, mature trees and a mix of original homes, past additions and newer two-story houses. It is the most active area for full rebuilds and second-story additions.
Westside lots are more varied and often smaller. Remodels here focus on making efficient use of modest footprints, and garage conversions, JADUs and lot splits are common.
Mesa Verde is largely made up of 1950s and 1960s ranch homes on wide lots. Many still have their original floor plan, which makes layout changes easier to plan, and deep backyards leave room for rear additions and detached ADUs.
Costa Mesa runs its own planning and building safety review. Interior remodels with new circuits, relocated plumbing or structural changes need a building permit and inspections. Additions and new homes also go through zoning review, and two-story projects are checked against the city's residential design standards for second-floor size, step-backs and privacy. ADUs follow state law, which sets limits on setbacks, parking and review time, plus the city's local standards. Utilities are handled by separate providers, including Southern California Edison for electrical service and the local water and sanitary districts for connections. You can find current requirements on the City of Costa Mesa website.
These are the projects we plan most often in the city, each with its own page:
Mr Build has been in business since 1984, holds California contractor license #439166 and has transformed 130+ homes and delivered 50+ ADUs, with a 4.9/5 average client rating. Every project starts with a free on-site consultation and follows five steps: consultation, design and permits, selections, construction and final walkthrough. You get a fixed, detailed written scope and a dedicated project manager from the first drawing to the final city sign-off.
Free on-site consultation. Clear written pricing. Design, permits and construction handled by one team.
Get Free Estimate888-792-8453Why homeowners choose us
One team owns the plans, the permit and the build, so nothing falls between an architect and a contractor.
We work with LADBS and the building departments in Beverly Hills, West Hollywood, Manhattan Beach and across Orange County.
You get a written scope with line-item pricing before work starts, and changes are priced and approved in writing.
One point of contact from consultation to final walkthrough, with scheduled updates instead of chasing.
Client reviews
★★★★★“Mr Build transformed our outdated kitchen into a beautiful, functional space. The team was professional, organized, and kept us updated throughout the project. The finished kitchen exceeded our expectations.”
★★★★★“We hired Mr Build for our bathroom remodel and couldn't be happier with the results. They helped us improve the layout, choose great finishes, and completed everything with impressive attention to detail.”
★★★★★“Mr Build handled our complete home remodel from start to finish. Communication was excellent, the workmanship was high quality, and every room now feels more modern, comfortable, and functional.”
FAQ
The City of Costa Mesa issues its own building permits and runs its own planning review, separate from Orange County. Most remodels with new plumbing, wiring or structural changes need a permit, and additions, ADUs and new homes also go through zoning review. We prepare and submit the drawings and handle plan check comments.
Kitchen and bathroom remodels in 1950s and 1960s ranch homes, garage conversions and detached ADUs, rear primary suite additions and second stories, and on larger Eastside lots, full teardowns replaced with new two-story homes. Many owners combine several of these into one project to share permits, inspections and disruption.
For many lots, yes. Deep backyards in Mesa Verde and on the Eastside, older detached garages and steady rental demand make ADUs a common project. State law sets the basic rules on setbacks, parking and review times, and the city adds local standards. The right type depends on your lot and goals.
Often. Homes from the 1950s and 1960s commonly have small electrical panels, galvanized supply pipes, cast-iron drains under the slab and little insulation. A remodel is the best time to replace them, because walls and floors are already open. We check these items at the first site visit so they are in the written scope.
From the blog

Sheet membranes, liquid membranes and the older liner-and-mortar pan can all keep a shower dry for decades. The details at the drain, corners and curb decide which one actually does.

West Hollywood does not require off-street parking for an ADU, even when you convert the garage. The real decisions are about your own cars, your future tenant and the street outside.

Good contractor communication is a system, not a personality match: one contact on each side, a set meeting, written summaries and signed change orders. Here is how to set it up.
Free estimate
Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.
Prefer to call? 888-792-8453