888-792-8453Monday–Friday, 9am–6pm · CA License #439166
Get Free Estimate
Remodeled Encino ranch home interior with an open kitchen, family room and new white oak floors

Home Remodeling · Encino, CA

Home Remodeling Company in Encino

Whole-home remodels of Encino ranch houses: new layouts, replaced systems, a cooler envelope for Valley summers and finished interiors, planned and built by one licensed team.

Since 1984License #4391664.9/5 client ratingDesign, permits & construction

A whole-house project is different from a string of separate remodels. When the kitchen, bathrooms, floors, windows, plumbing and electrical all change at once, the order of work and the decisions behind it matter more than any single finish. As a home remodeling company in Encino, we help owners of the neighborhood's 1950s and 60s ranch homes plan that kind of project from the structure out, so the house works better, runs cooler and lasts longer.

Mr Build Co. has been a design-build general contractor since 1984, holding California license #439166, with more than 130 homes transformed. We coordinate design, plans, engineering and permits through our partners and write the project as one fixed, detailed scope.

What an Encino ranch house usually needs

These homes were well built for their time, but six decades show. A thorough remodel typically addresses:

  • Layout: closed kitchens, narrow halls and small primary suites
  • Plumbing: galvanized supply lines and aging cast iron drains
  • Electrical: small original panels and too few circuits for modern kitchens, heat pumps and EV charging
  • HVAC: older equipment with ducts in a hot attic
  • Envelope: thin or missing insulation and single-pane aluminum windows
  • Structure: missing foundation bolts or cripple wall bracing on raised-foundation homes

We document each of these during the free consultation, because they shape the budget long before you pick tile.

Whole-home remodel in progress with new plumbing and wiring in open walls of an Encino house

Planning a whole-home remodel around Valley heat

Encino summers are long and hot, and the original houses were not built for them. A whole-home remodel opens walls and ceilings, which makes this the cheapest moment to fix the envelope for good.

The attic and roof

Air sealing the ceiling, adding insulation and replacing an old roof with a reflective cool-roof material lower attic temperatures. Moving ducts into conditioned space, or at least sealing and insulating them, keeps cooled air from heating up before it reaches the rooms.

Windows and shade

Dual-pane, low-solar-gain glass on the south and west sides cuts heat gain. Our comparison of double-pane and triple-pane windows explains why double-pane is usually the right choice in this climate.

Equipment

A correctly sized heat pump, based on the improved envelope rather than the old one, often replaces both the furnace and the air conditioner. Remodels that alter systems must meet California's energy code, and our energy code guide for remodels covers what that requires.

Reworking the layout

Most whole-home remodels in Encino change the plan in a few predictable ways: the kitchen opens to the family room, the primary bath grows into an adjacent closet or bedroom, a hall bath is reconfigured and the connection to the backyard widens. Each change touching a bearing wall needs a beam and engineering. Settling the plan before ordering anything lets the engineer, designer and trades work from one set of drawings.

Some owners find the existing footprint is simply too small, even after a better layout. Adding a primary suite or family room in the same project shares the permit, the engineering and the crew mobilization, and it lets the new roof and the old one be designed together. If that is on the table, our page on room additions in Encino covers how those tie into a ranch house. Others keep the house as it is and put the extra space in a backyard unit instead.

Permits for a home remodel in Encino

LADBS issues permits for Encino, which is part of the City of Los Angeles. A whole-home remodel usually goes through plan check with architectural and structural drawings and energy-code documents, plus separate electrical, plumbing and mechanical permits. Inspections run throughout: framing, rough-ins, insulation and final.

Large remodels can trigger requirements beyond the work you planned, such as utility service changes, smoke and carbon monoxide alarm upgrades or work to legalize earlier unpermitted changes. We raise these with LADBS early so they are in the scope, not surprises.

Updated Encino ranch house exterior with new windows, a cool roof and refreshed stucco

Living at home, moving out or phasing

This is one of the first decisions we make together. Moving out for the heaviest phase shortens the schedule and simplifies protection. Staying in the house works if one bathroom and a few rooms stay usable throughout. Phasing the work over time spreads the cost but repeats some setup. Our guides to living through a remodel and phased remodeling walk through each option.

Cost and timeline factors

Whole-home budgets depend on scope and conditions more than square footage. The main drivers are how many walls move, how much of the plumbing and electrical is replaced, the HVAC and envelope upgrades, the number of kitchens and bathrooms, finish level and what is found behind the walls.

Timelines follow the same logic. Design and plan check come first; structural changes add engineering review. During construction, demolition and rough-ins move quickly, inspections set the pace in the middle, and finishes, cabinets and custom items such as glass and countertops take the most calendar time. Living in the house or phasing the work extends the schedule.

The selection schedule protects both. We give you a list of decisions with dates: layout and windows first, then cabinets, plumbing fixtures and tile, then lighting, hardware and paint. Ordering in that sequence means long-lead items arrive before the crew needs them, and you are never choosing a faucet under pressure while a plumber waits.

What our home remodeling company in Encino handles

We handle everything a whole-home remodel needs: design, plans, engineering, LADBS permits, demolition, structural work, plumbing, electrical, HVAC, insulation, windows, roofing, kitchens, bathrooms, flooring, paint and final inspection. One project manager runs the job. Projects follow our five steps: consultation, design and permits, selections, construction and a final walkthrough. Read more on our complete remodeling page.

Our process

How a project with Mr Build works

Five steps, one team and one point of contact from the first visit to the final walkthrough.

  1. Consultation

    We meet at your home, walk the space, and talk through goals, priorities and budget before anything is drawn.

  2. Design & Permits

    Plans, engineering and energy calculations are prepared and submitted, and we handle plan-check corrections with the city.

  3. Selections

    You choose finishes, fixtures and materials with our guidance, so long-lead items are ordered before they can hold up the schedule.

  4. Construction

    A dedicated project manager runs the trades, inspections and schedule, with regular updates so you always know what's next.

  5. Final Walkthrough

    We walk every room with you, finish the punch list, close out the permit, and hand over warranties and manuals.

Client reviews

What our clients say

★★★★★

“Mr Build handled our complete home remodel from start to finish. Communication was excellent, the workmanship was high quality, and every room now feels more modern, comfortable, and functional.”

Michael S.Studio City, CA
★★★★★

“Mr Build transformed our outdated kitchen into a beautiful, functional space. The team was professional, organized, and kept us updated throughout the project. The finished kitchen exceeded our expectations.”

Jennifer L.Los Angeles, CA
★★★★★

“We hired Mr Build for our bathroom remodel and couldn't be happier with the results. They helped us improve the layout, choose great finishes, and completed everything with impressive attention to detail.”

David R.Encino, CA

FAQ

Home Remodeling in Encino: common questions

What does a whole-home remodel in Encino usually include?

Most include a new kitchen, updated bathrooms, flooring and paint throughout, and at least some layout changes such as opening the kitchen to the family room. Behind the walls, older Encino homes often get a repipe, an electrical panel upgrade, new HVAC with better ducts, insulation and new windows. Some owners add a primary suite or ADU in the same project.

Can I remodel my Encino house in phases instead of all at once?

Yes, and it can work well if the phases are planned in the right order. Infrastructure such as the electrical service, main plumbing lines and roof should come early so later phases do not tear out new finishes. Phasing does cost more in total, because crews mobilize more than once and some permits repeat, but it can match a budget or a family schedule better.

Should we move out during a whole-home remodel?

For a true whole-home remodel, most families move out for at least part of the work, because the kitchen, bathrooms, power and water are all disrupted. Partial remodels can be lived through if one bathroom and a few rooms stay usable. We plan the sequence around your decision, which is one of the first questions we settle.

How can I make my Encino house cooler in summer during a remodel?

Combine several upgrades while walls and ceilings are open: attic insulation and air sealing, dual-pane low-solar-gain windows, a cool or reflective roof, ducts moved into conditioned space or sealed and insulated, and a correctly sized heat pump. Shade on the west side, from overhangs or trees, also cuts afternoon heat.

What permits does a whole-home remodel in Encino need?

Encino is in the City of Los Angeles, so LADBS issues the permits. A whole-home remodel typically needs a building permit with plan check plus electrical, plumbing and mechanical permits. Structural changes need engineering. A large enough scope can trigger extra upgrades, so we ask LADBS early what your scope will require.

From the blog

Helpful reading

Homeowner and contractor comparing kitchen tile samples on a countertop during a site meeting

Construction & PlanningOctober 19, 2026

How to Communicate With Your Contractor During a Remodel

Good contractor communication is a system, not a personality match: one contact on each side, a set meeting, written summaries and signed change orders. Here is how to set it up.

Floor-to-ceiling plastic containment wall with a zipper door sealing off a kitchen remodel

Construction & PlanningOctober 14, 2026

Can You Live at Home During a Remodel? How to Decide

Many families can stay home during a remodel if the work is contained and a kitchen and bathroom stay usable. Here is how to decide, what to require from your contractor and when to move out.

Free estimate

Let's talk about your home

Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.

  • On-site visit with an experienced builder
  • Clear written scope and pricing
  • Design, engineering and permits handled for you

Prefer to call? 888-792-8453

Get Free Estimate

We reply within one business day. No obligation.
Call nowGet Free Estimate