888-792-8453Monday–Friday, 9am–6pm · CA License #439166
Get Free Estimate
Open living, dining and kitchen area after a whole-home remodel of a Costa Mesa ranch house

Home Remodeling · Costa Mesa, CA

Home Remodeling Company in Costa Mesa

Complete remodels of Costa Mesa ranch and tract homes, from a reworked floor plan to new wiring, plumbing, windows and finishes, planned and priced as one project.

Since 1984License #4391664.9/5 client ratingDesign, permits & construction

A complete remodel is the right fit for many Costa Mesa homes. The houses on the Eastside, the Westside and in Mesa Verde were well built for their time, and most sit on good lots in good locations. What they usually lack is an open plan, enough bathrooms, modern wiring and plumbing, and windows and insulation that keep them comfortable. As a home remodeling company in Costa Mesa, Mr Build updates all of that in one project, with one plan and one written price.

Here is what a whole-home remodel in Costa Mesa usually involves and how to plan for it.

What a whole-home remodel covers in a Costa Mesa ranch

Most of the complete remodels we see in Costa Mesa start with a modest single-story house built in the 1950s or 1960s. The usual goals:

  • Open the kitchen to the living and dining areas.
  • Turn a small bathroom and a half bath into two full baths, or add a primary suite inside the existing footprint.
  • Replace dated flooring with one continuous material through the main rooms.
  • Add good lighting to rooms that had a single ceiling fixture.
  • Improve the connection to the backyard with larger doors.

The starting point differs by neighborhood. Mesa Verde ranches often still have their original floor plan, which makes the structure easy to read and the new layout easier to plan. Eastside homes are more likely to carry decades of earlier remodels and additions, some unpermitted, so we budget time to investigate and correct past work. On the Westside, smaller footprints push the design toward efficient storage and fewer, better-proportioned rooms rather than more of them.

These are design goals. The bigger part of the work, and the budget, is often in the systems behind the walls.

Interior of a Costa Mesa home opened to the studs with new wiring and plumbing during a complete remodel

Updating the bones: what we usually find

When a Costa Mesa house is opened to the studs, the same items come up again and again.

SystemTypical conditionWhat we usually do
ElectricalSmall panel, few circuits, ungrounded outlets in older roomsNew panel or service, rewire main areas, add dedicated kitchen and bath circuits
Supply plumbingGalvanized steel with low pressure and rustRepipe in copper or PEX while walls are open
Drain linesCast iron or clay under the slab, sometimes crackedCamera inspection, then line or replace failed sections
InsulationLittle or none in walls, thin attic insulationInsulate open walls and upgrade the attic
WindowsSingle-pane aluminumDual-pane energy-compliant units, with openings resized where the plan changes
Heating and coolingOld wall furnace or floor furnace, no air conditioningHeat pump system, ducted or ductless

Older finishes also need testing before demolition. Flooring adhesive, textured ceilings and drywall compound from this era can contain asbestos, and pre-1978 paint is assumed to contain lead until tested.

All at once or in phases

Doing the whole house at once is the most efficient approach: one demolition, one rough-in, one set of inspections, and a shorter total schedule. The cost is moving out for part of the job.

Phasing lets you stay home by remodeling one zone at a time, often the kitchen and living areas first and bedrooms and baths second. It costs more overall, because crews mobilize twice and the occupied part of the house has to be protected. Our articles on phased remodeling and living at home during a remodel go through the trade-offs in detail.

Permits for a whole-home remodel in Costa Mesa

A complete interior remodel is permitted by the City of Costa Mesa's building safety staff, with plan review for structural changes and energy compliance. Removing bearing walls requires engineered drawings, and new windows and HVAC must meet the California Energy Code. If the remodel changes the exterior, adds floor area or raises the roof, planning review applies too, including the city's standards for second stories. Inspections follow each phase of work, from framing and rough trades through insulation and final.

Remodeled Costa Mesa hallway with new oak flooring, recessed lighting and updated doors

What drives the cost of a complete remodel

  • How much of the layout changes. Moving the kitchen or bathrooms means new drain routes across the slab.
  • System replacement. Rewiring, repiping and new HVAC are large line items that do not show in photos but pay off for decades.
  • Structural work. Each removed bearing wall needs a beam, posts and sometimes new footings.
  • Windows and doors. Quantity, size and frame material.
  • Finish selections. Cabinets, counters, tile and flooring across the whole house multiply any per-room choice.
  • Phasing and protection. Living in the house during work adds time and cost.

For a sense of how budgets usually split across these categories, see our renovation budget breakdown.

Timeline factors

A whole-home remodel has more moving parts than any single-room project. Design and engineering take time, plan check may return comments, and long-lead items such as windows and cabinets need to be ordered before demolition so they arrive when framing and rough-in are done. Our home remodel timeline article shows a typical sequence.

Two other items can add weeks if they are left late: abatement, which has to be scheduled with a licensed contractor before demolition, and any electrical service upgrade that needs Southern California Edison to set a new meter. We start both as soon as the scope is settled.

What Mr Build handles

We manage the entire remodel: measured drawings, design, engineering and energy compliance through our partners, permits, hazardous materials testing, demolition, structural work, all trades, finishes and final inspection. A dedicated project manager leads the job through our five steps: consultation, design and permits, selections, construction and final walkthrough. If you are starting with one room, see our kitchen remodeling in Costa Mesa page.

Our process

How a project with Mr Build works

Five steps, one team and one point of contact from the first visit to the final walkthrough.

  1. Consultation

    We meet at your home, walk the space, and talk through goals, priorities and budget before anything is drawn.

  2. Design & Permits

    Plans, engineering and energy calculations are prepared and submitted, and we handle plan-check corrections with the city.

  3. Selections

    You choose finishes, fixtures and materials with our guidance, so long-lead items are ordered before they can hold up the schedule.

  4. Construction

    A dedicated project manager runs the trades, inspections and schedule, with regular updates so you always know what's next.

  5. Final Walkthrough

    We walk every room with you, finish the punch list, close out the permit, and hand over warranties and manuals.

Client reviews

What our clients say

★★★★★

“Mr Build handled our complete home remodel from start to finish. Communication was excellent, the workmanship was high quality, and every room now feels more modern, comfortable, and functional.”

Michael S.Studio City, CA
★★★★★

“Mr Build transformed our outdated kitchen into a beautiful, functional space. The team was professional, organized, and kept us updated throughout the project. The finished kitchen exceeded our expectations.”

Jennifer L.Los Angeles, CA
★★★★★

“We hired Mr Build for our bathroom remodel and couldn't be happier with the results. They helped us improve the layout, choose great finishes, and completed everything with impressive attention to detail.”

David R.Encino, CA

FAQ

Home Remodeling in Costa Mesa: common questions

What counts as a whole-home remodel?

A whole-home remodel changes most of the interior at once: layout, kitchen, bathrooms, flooring, lighting and often the systems behind the walls, such as wiring, plumbing, insulation and HVAC. It usually keeps the foundation, exterior walls and roof structure. If you also want to add a second story or replace the foundation, it is worth comparing the remodel against a rebuild.

Do I need to move out during a complete remodel of my Costa Mesa house?

For a true whole-home remodel, most families do, at least for the middle of the job when water, power and bathrooms are out of service. Some projects can be phased, with one wing finished before the next is opened, but that takes longer overall and costs more in protection and cleanup. We help you weigh both options before construction starts.

Will a whole-home remodel require me to bring my Costa Mesa house up to current code?

The work you do has to meet current code, and certain upgrades are triggered by permitted work, such as smoke and carbon monoxide alarms and, on older homes, water-saving plumbing fixtures. Parts of the house you do not touch can generally stay as they are, but replacing most systems at once usually brings the whole house close to current standards anyway.

How do you handle asbestos and lead in a 1950s or 1960s Costa Mesa home?

We test suspect materials before demolition, including flooring and adhesive, textured ceilings, drywall compound and old paint. If asbestos is found, a licensed abatement contractor removes it before our crews start. Homes built before 1978 are treated as likely to have lead paint, so we follow lead-safe work practices whenever painted surfaces are disturbed.

From the blog

Helpful reading

Homeowner and contractor comparing kitchen tile samples on a countertop during a site meeting

Construction & PlanningOctober 19, 2026

How to Communicate With Your Contractor During a Remodel

Good contractor communication is a system, not a personality match: one contact on each side, a set meeting, written summaries and signed change orders. Here is how to set it up.

Floor-to-ceiling plastic containment wall with a zipper door sealing off a kitchen remodel

Construction & PlanningOctober 14, 2026

Can You Live at Home During a Remodel? How to Decide

Many families can stay home during a remodel if the work is contained and a kitchen and bathroom stay usable. Here is how to decide, what to require from your contractor and when to move out.

Free estimate

Let's talk about your home

Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.

  • On-site visit with an experienced builder
  • Clear written scope and pricing
  • Design, engineering and permits handled for you

Prefer to call? 888-792-8453

Get Free Estimate

We reply within one business day. No obligation.
Call nowGet Free Estimate