Demolition of an older beach cottage on a narrow Manhattan Beach lot with alley access

Demolition & Rebuild · Manhattan Beach, CA

Demolition and Rebuild Contractor in Manhattan Beach

Teardown-rebuilds on Manhattan Beach lots, from the pre-demolition survey and utility disconnects to shoring, coastal review and a new home built for salt air.

Since 1984License #4391664.9/5 client ratingDesign, permits & construction

Teardown-rebuilds are part of the fabric of Manhattan Beach. Walk any street in the Sand, Hill or Tree Section and you will see a small beach cottage or 1950s ranch next to a new three-story home, and another one coming down a block away. As a demolition and rebuild contractor in Manhattan Beach, we take that process from the first survey of the old house to the final inspection of the new one, under one team and one fixed scope.

Since 1984, Mr Build Co. has worked as a licensed design-build general contractor (California license #439166). Our partners handle the design, engineering and permit drawings, while our own project manager sequences the teardown and the new construction as one job, so the lot does not sit idle between them.

Demolition and rebuild in Manhattan Beach: why it is so common

The economics are simple: on most lots, the land carries most of the value, and the existing house may not reflect what the lot can hold. Common reasons owners rebuild:

  • The house is small relative to the floor area the lot allows
  • Decades of salt air have left corroded systems, rotted framing and failing windows
  • Foundations are old, cracked or not anchored to current seismic standards
  • The layout, ceiling heights and room orientation do not suit the views or the family
  • A remodel would replace nearly everything anyway

Rebuilding is not always the answer. A sound house with a good layout, or one with nonconforming setbacks that new construction could not repeat, can be worth keeping. We put both options in writing. If adding on makes more sense, see our page on room additions in Manhattan Beach.

Engineered shoring along a property line for a new basement in Manhattan Beach

Survey first, then demolish

In Manhattan Beach, the existing ground under your house matters more than in most cities. Building height is measured from a reference based on the lot's existing grade at the property corners. That makes a topographic survey before demolition essential. It records grade, the existing structure, utilities and neighboring improvements before anything is disturbed. The survey also documents conditions at the property line, which protects you if a neighbor raises questions later.

We also order the soils report early. Sandy beach soils and, on some lots, groundwater affect foundation design, basement waterproofing and shoring, and knowing those conditions before the old house comes down lets the engineer finish the foundation design while abatement and disconnects are underway.

Demolition on a tight beach lot

  1. Asbestos and lead testing. South Coast AQMD Rule 1403 requires an asbestos survey before demolition, and many older homes contain it in ceilings, flooring, stucco or duct wrap. Lead paint is common in pre-1978 houses.
  2. Abatement. Licensed abatement contractors remove any asbestos before the main demolition.
  3. Utility disconnects. Southern California Edison, SoCalGas and the city water service are disconnected, and the sewer lateral is capped.
  4. Neighbor documentation. We photograph adjoining walls, fences and houses before work begins.
  5. Demolition permit. The city issues it once prerequisites are complete.
  6. Teardown and haul. On narrow lots, equipment size and truck access, usually from the alley, are planned in advance. Dust is controlled with water, and work stays within permitted hours. Concrete, metal and clean wood are separated for recycling where the hauler can take them, and fixtures worth saving can be pulled out for reuse before the machines arrive.

Rebuilding under current rules

The new home must meet Manhattan Beach's current zoning and building codes. The City of Manhattan Beach Community Development Department reviews:

  • Height, floor area, setbacks and parking under the city's zoning code
  • Coastal Development Permit requirements for parcels in the coastal zone
  • Soils reports and, for basements, shoring plans protecting adjoining properties
  • Structure, fire safety and California energy code, including the solar requirement for new homes
  • Public Works items such as driveway aprons, sidewalks and alley improvements

Basements are common in rebuilds here because they add space below the height limit. They require excavation, shoring next to property lines and waterproofing suited to sandy soil. For the design side of the new home, our custom home builder page for Manhattan Beach goes deeper.

Newly rebuilt modern home in Manhattan Beach with a roof deck and coastal-grade windows

Cost drivers

  • Abatement scope for asbestos and lead
  • Basement excavation, shoring and waterproofing
  • Size, complexity and finish level of the new home
  • Coastal review studies and design requirements
  • Site logistics: alley access, small equipment, limited staging
  • Utility service connections and Public Works improvements
  • Coastal-grade materials throughout the exterior

Timeline factors

Most of the calendar is spent before demolition: survey, design, planning and coastal review, and building plan check. We time abatement, utility disconnects and the demolition permit so the house comes down close to the start of construction, which keeps the lot from sitting empty. Basements and shoring add time to the early phase of construction. After that, framing on a compact lot moves quickly, and finishing depends on materials and decisions made early.

Summer adds its own pressure near the beach. Visitor parking fills the streets closest to the sand, so we schedule large deliveries, concrete pours and haul-offs for early hours and keep crew vehicles off the walk streets and alleys as much as possible. Planning those logistics with neighbors up front avoids most of the friction a rebuild can cause on a close-knit block.

One team from teardown to final inspection

Mr Build manages the complete rebuild: survey and feasibility, design, plans, engineering, permits and coastal review coordination, abatement, utility disconnects, demolition, shoring, foundations, framing, systems, finishes and final inspection, with one project manager. The project follows our five steps: consultation, design and permits, selections, construction and a final walkthrough. For more on our approach, see demolition and rebuild.

Our process

How a project with Mr Build works

Five steps, one team and one point of contact from the first visit to the final walkthrough.

  1. Consultation

    We meet at your home, walk the space, and talk through goals, priorities and budget before anything is drawn.

  2. Design & Permits

    Plans, engineering and energy calculations are prepared and submitted, and we handle plan-check corrections with the city.

  3. Selections

    You choose finishes, fixtures and materials with our guidance, so long-lead items are ordered before they can hold up the schedule.

  4. Construction

    A dedicated project manager runs the trades, inspections and schedule, with regular updates so you always know what's next.

  5. Final Walkthrough

    We walk every room with you, finish the punch list, close out the permit, and hand over warranties and manuals.

Client reviews

What our clients say

★★★★★

“Mr Build handled our complete home remodel from start to finish. Communication was excellent, the workmanship was high quality, and every room now feels more modern, comfortable, and functional.”

Michael S.Studio City, CA
★★★★★

“Mr Build transformed our outdated kitchen into a beautiful, functional space. The team was professional, organized, and kept us updated throughout the project. The finished kitchen exceeded our expectations.”

Jennifer L.Los Angeles, CA
★★★★★

“We hired Mr Build for our bathroom remodel and couldn't be happier with the results. They helped us improve the layout, choose great finishes, and completed everything with impressive attention to detail.”

David R.Encino, CA

FAQ

Demolition & Rebuild in Manhattan Beach: common questions

Why are so many Manhattan Beach homes torn down and rebuilt?

Land is the main value on most Manhattan Beach lots, and many older houses are small, worn or built well below what current rules allow. When a remodel would replace most of the structure, systems and foundation anyway, building new can give a far better house for the investment, with a modern layout, current energy and seismic standards and materials chosen for the coast.

Why should the lot be surveyed before demolition?

Manhattan Beach measures building height from a reference based on the lot's existing grade at the property corners. A topographic survey done before demolition records that grade, plus the existing structure and neighboring conditions, before the site is disturbed. It also documents setbacks and adjoining properties, which helps with design and with any disputes about damage later.

What has to happen before a house can be demolished in Manhattan Beach?

An asbestos survey is required under South Coast AQMD Rule 1403, with abatement if asbestos is found. Utilities are disconnected: Southern California Edison for power, SoCalGas for gas and the city for water, plus a capped sewer lateral. The city then issues the demolition permit, often coordinated with the permit for the new house.

How do you protect neighboring houses during demolition and excavation?

On narrow lots, the next house may be only a few feet away. We document neighboring conditions with photos before work, control dust with water, and use smaller equipment where needed. For basements or deep foundations, an engineered shoring system holds back the soil next to property lines, and the work is monitored during excavation.

Does a rebuild need a Coastal Development Permit?

If the lot is in the coastal zone, which covers part of Manhattan Beach, demolishing and replacing a home generally requires coastal review along with the city's planning and building approvals. The city handles many of these locally. Check your parcel with the Community Development Department before design, since coastal review adds steps to the schedule.

From the blog

Helpful reading

Homeowner and contractor comparing kitchen tile samples on a countertop during a site meeting

Construction & PlanningOctober 19, 2026

How to Communicate With Your Contractor During a Remodel

Good contractor communication is a system, not a personality match: one contact on each side, a set meeting, written summaries and signed change orders. Here is how to set it up.

Free estimate

Let's talk about your home

Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.

  • On-site visit with an experienced builder
  • Clear written scope and pricing
  • Design, engineering and permits handled for you

Prefer to call? 888-792-8453

Get Free Estimate

We reply within one business day. No obligation.
Call nowGet Free Estimate