
In this article
- What the California solar mandate requires
- Which projects trigger the solar requirement?
- Exceptions and solar-ready requirements
- How the 2025 Energy Code affects your permit timeline
- How solar shapes the design of a new home
- Solar on a new detached ADU
- Utility interconnection and billing
- Questions to ask before design begins
- How Mr Build plans for the solar requirement
Yes, California has a solar mandate. The state's energy code, Title 24 Part 6, requires a solar photovoltaic (PV) system on most newly built low-rise homes, and that includes many newly built detached ADUs. Most remodels, room additions, garage conversions and other work on existing homes do not trigger it.
The requirement has been in place since the 2019 standards took effect on January 1, 2020, and later code cycles have kept it while adding rules for battery readiness and all-electric equipment. The current 2025 Energy Code applies to permit applications submitted on or after January 1, 2026. This guide explains which projects need solar, what exceptions exist and how the requirement shapes design, permits and budget.
What the California solar mandate requires
The California Energy Commission adopts the Building Energy Efficiency Standards and updates them every three years. For new low-rise residential buildings, the standards require a PV system as part of the energy compliance package, much like insulation levels or window performance.
A few points homeowners often get wrong:
- The size comes from a formula, not your electric bill. The required PV capacity is calculated from the home's conditioned floor area and its climate zone, and it can be limited by how much usable roof area the house has.
- It is a minimum. You can install a larger system if your budget, roof and utility allow it.
- It ties into the rest of the energy design. The solar system, insulation, windows, HVAC and water heating are modeled together in the Title 24 energy report your designer or energy consultant prepares.
- Batteries are mostly optional for houses. New homes may need to be wired so a battery can be added later, and installing one can affect how the home complies.
The California Energy Commission publishes the standards, compliance manuals and frequently asked questions, and your city's building department enforces them at plan check and inspection.
Which projects trigger the solar requirement?
The question that matters most is whether your project counts as new construction. Here is how the most common residential projects usually fall:
| Project | Solar PV usually required? | Notes |
|---|---|---|
| New custom single-family home | Yes | Unless an exception applies |
| Teardown and rebuild | Usually yes | Typically treated as new construction; confirm with the city |
| New detached ADU | Usually yes | Counts as a new low-rise residential building |
| Attached ADU or room addition | Generally no | Other energy code rules apply to the new space |
| Garage conversion or junior ADU | Generally no | Treated as an alteration of existing space |
| Kitchen, bathroom or whole-home remodel | No | Lighting, insulation and HVAC rules apply where you make changes |
Remodels have their own energy code obligations, and they catch many homeowners by surprise. Our article on the California energy code for remodels walks through what applies when you open walls, change windows or replace HVAC equipment.
If you are rebuilding in Pacific Palisades after the January 2025 fire, the city and state have put special rebuild rules in place that can affect which requirements apply and how quickly plans move. Those rules have changed over time, so confirm the current approach with LADBS before your design is finalized.
Exceptions and solar-ready requirements
Not every new home ends up with panels on the roof. The code includes exceptions for situations where a useful system is not practical. Common examples are a roof with too little unshaded, well-oriented area, or a calculated system so small it falls below the code's minimum. The exact conditions are spelled out in the current standards and checked in your energy report.
An exception does not always mean nothing is needed. Depending on the project, the plans may still have to show solar-ready provisions so a system can be added later, such as:
- A reserved area of roof kept clear of vents, skylights and equipment
- A raceway or conduit path from the roof to the electrical panel
- Space in the main panel for a future solar breaker
- Structural design that can carry future panels
Shade from trees, neighboring buildings and hillsides is assessed as part of the calculation. On narrow Los Angeles lots and canyon sites, this is often where the real answer gets decided.
How the 2025 Energy Code affects your permit timeline
The code that applies to your project depends on when your permit application is submitted, not when construction starts. Applications submitted on or after January 1, 2026 fall under the 2025 Energy Code and need the updated compliance forms and software. A project submitted earlier generally stays under the prior cycle, as long as the permit stays active.
The 2025 standards continue the solar requirement for new homes and continue the state's push toward electric heat pump space and water heating. If your design was started under the old rules but has not been submitted, expect the energy report to be redone.
The paperwork usually runs in this order:
- Design: your energy consultant models the home and produces the compliance report that shows the required PV size and other measures.
- Plan check: the building department reviews the report and the plans, including the roof layout and electrical sheets.
- Construction: installers document what was actually installed, and a third-party HERS rater verifies certain energy features in the field.
- Final inspection: the city confirms the system and documentation before signing off.
Your utility's interconnection approval is a separate track, covered below. Starting it late is one of the most common reasons a finished house sits waiting.
How solar shapes the design of a new home
On a new custom home, solar is a design decision, not an add-on. It affects:
- Roof shape and orientation. South- and west-facing planes with few interruptions give the most usable area. Hips, dormers and many small planes reduce it.
- Where vents and equipment go. Plumbing vents, exhaust fans and skylights need to stay out of the solar area.
- Fire access. Fire codes require clear pathways and setbacks around rooftop panels, which reduces how much roof the array can cover.
- Electrical service. The panel and service size need to handle the PV system, any battery, EV charging and all-electric appliances.
- Structure. The roof framing has to carry the panels, and in some cases a future battery location needs wall space and clearances.
Getting these choices settled in design keeps plan check simpler and avoids change orders once framing starts.

Remodels: no mandate, but a good time to prepare
Even though a remodel does not require solar, it is often the cheapest moment to get ready for it. If walls are open and the electrical panel is being upgraded, adding a conduit path to the attic and reserving panel space costs far less than opening finished walls later.
Solar on a new detached ADU
ADUs raise their own questions. The required system is usually small because the floor area is small, and a compact or shaded ADU roof may limit how much can be installed. In some cases the system can be placed elsewhere on the property, such as on the main house; your energy consultant and the city will confirm what is allowed for your lot.
Also decide early how the ADU will be metered and connected. A separate meter, a shared service and the solar system all affect the panel, trenching and the utility's paperwork. Our guide to ADU utility connections covers those choices in more detail.
Utility interconnection and billing
The building code decides whether you need solar. Your utility decides how the system connects to the grid and how exported power is credited. These are separate approvals, and both need to be planned.
- Most of the City of Los Angeles is served by LADWP, a city-owned utility with its own solar interconnection and billing programs.
- Much of the rest of the area, including many Westside and South Bay cities and most Orange County cities, is served by Southern California Edison. New solar customers on investor-owned utilities like SCE are generally on the state's net billing tariff, which credits exported power at lower rates than the older net metering programs. That makes batteries and self-consumption more valuable.
Start the interconnection application once the system design is final rather than after construction. Federal tax incentives for homeowner solar also changed under 2025 federal legislation, so check current eligibility with a tax professional before you count on a credit in your budget.
Questions to ask before design begins
- Does my project count as new construction under the energy code, or as an addition or alteration?
- Roughly how large a PV system will the energy report require, and does my roof have room for it?
- Will trees, neighbors or the roof shape trigger an exception or limit the system size?
- Does the electrical design leave room for a battery, EV charging and heat pump equipment?
- Who prepares the energy report, and who coordinates with the utility?
- Is the solar system included in the construction scope and price, or carried as a separate contract?
How Mr Build plans for the solar requirement
Mr Build Co. has built custom homes, ADUs and rebuilds across Los Angeles and Orange County since 1984. Our design and permit team, working with engineering partners, accounts for the energy code from the first design meeting, so roof layout, electrical service and solar are settled before plans go to the city. Your fixed, detailed written scope shows what is included, and a dedicated project manager tracks inspections and sign-offs through the final walkthrough.
Planning a new house or rebuild? See our custom home building services or our page on custom homes in Pacific Palisades, then book a free consultation to talk through how the solar mandate applies to your project.
Sources and further reading
- California Energy Commission energy.ca.gov
- California Public Utilities Commission’s customer-generation rules webproda.cpuc.ca.gov
- this guide to matching mount systems to metal roofing coastalroofingfla.com
- Internal Revenue Service irs.gov


