888-792-8453Monday–Friday, 9am–6pm · CA License #439166
Get Free Estimate
Engineered beam installed between the kitchen and family room during an Irvine remodel

General Contractor · Irvine, CA

General Contractor in Irvine

Irvine projects come with two rulebooks, the city's and your association's, plus a crew of trades to schedule. A licensed general contractor keeps all of it under one plan and one point of contact.

Since 1984License #4391664.9/5 client ratingDesign, permits & construction

Hiring a general contractor in Irvine is the simplest way to handle a project that crosses several trades or needs approvals. Most Irvine homes are in good shape structurally, so the work here is less about rescuing an old house and more about coordination: reshaping a floor plan, replacing aging systems, and getting the city and the homeowners association to sign off in the right order.

A licensed general contractor holds the permits, sequences the trades, schedules inspections and answers for the result. In Irvine, the GC also manages the association side, which can involve as much paperwork as the city.

What a general contractor in Irvine typically takes on

  • Opening floor plans. Removing the wall between kitchen and family room, or between formal living and dining rooms, with an engineered beam in two-story homes.
  • Multi-room remodels. Kitchen, bathrooms, flooring and lighting done together.
  • Repiping. Replacing aging supply lines in 1970s to 1990s homes, routed through the attic and walls rather than the slab.
  • Stair replacements. Swapping carpeted stairs and spindle rails for wood or metal and glass, which can require structural and guard changes.
  • Window and door replacements. Retrofit or full-frame, with HOA approval of style and color.
  • Garage reconfigurations. Built-in storage, a workshop, or converting part of a three-car garage to living space.
  • Additions. Rear bump-outs and second stories; see our room addition contractor in Irvine page.
Project manager reviewing plans at an Irvine home under renovation with HOA-approved exterior materials

Systems that age out in Irvine homes

A house from the 1970s or 1980s is now old enough that several systems are due at once, and finding that out before a remodel saves money. During our first walkthrough we look at:

  • Electrical panels. Some homes of that era still have original panels, including brands with known reliability problems, and many lack the capacity for an induction range, a heat pump or an EV charger.
  • HVAC and ducts. Original furnaces and air conditioners in the attic or garage, with duct runs that leak or have come apart.
  • Windows. Single-pane aluminum windows in the oldest villages, and early dual-pane units whose seals have failed.
  • Water heaters and supply lines. Tanks near the end of their service life and supply piping that has started to leak.

None of these needs to be done all at once, but a general contractor can show you which ones affect the remodel you are planning and which can wait.

Working with the city and the association

The City of Irvine

The Community Development Department handles building permits, plan check and inspections for structural, plumbing, electrical and mechanical work. Projects are submitted electronically, and the city's review comments have to be answered before permits issue. California's energy code applies to altered systems, lighting and new windows, and permitted work generally triggers smoke and carbon monoxide alarm upgrades.

Your HOA

Most Irvine single-family homes belong to a village association and often a master association. Exterior changes, such as windows, doors, roofing, paint, solar layout, hardscape and additions, generally need architectural approval. Many associations also require contractor registration, proof of license and insurance, set working hours, and limit where dumpsters and trucks can go. Condos and townhomes add rules about shared walls, plumbing stacks and flooring underlayment.

A GC who prepares both submittals from the same drawings keeps the two reviews consistent and avoids approving one version with the HOA and another with the city.

Sequencing a multi-trade project

The order of work matters more than any single trade. On a typical Irvine remodel:

  1. Approvals from the association and permits from the city
  2. Protection of floors, stairs and HVAC returns, then demolition
  3. Structural work, including beams, posts and any slab work after tendon scanning
  4. Rough plumbing, electrical and HVAC, followed by inspections
  5. Insulation, drywall and texture matched to the existing walls
  6. Cabinets, tile, flooring and finish carpentry
  7. Fixtures, paint, final inspections and walkthrough

Your decisions follow the same order. Layout and structure first, fixture locations before rough-in, and long-lead items such as custom cabinets and windows before construction starts. When the sequence slips, trades end up waiting on each other or redoing work, and that is where schedules and budgets usually go wrong.

New PEX repipe in an open attic of an Irvine tract home before drywall repair

What drives cost

We work from a fixed, detailed written scope, so you see the price of each part of the job. The main variables:

  • How many trades are involved and how their work overlaps
  • Structural changes and the engineering they require
  • Slab work, including scanning for post-tension cables
  • Extent of system replacement: plumbing, electrical, HVAC
  • HOA-required exterior materials and colors
  • Finish selections and whether they are fixed or written allowances
  • Logistics, such as gated access, limited parking and staging rules

If you are comparing proposals, our article on cost-plus versus fixed-price contracts explains the difference.

Timeline factors

On larger Irvine projects, association review and city plan check together can take longer than the first phase of construction, so starting them early matters. During construction, inspections, material lead times and hidden conditions set the pace. Good communication shortens everything; our guide on communicating with your contractor covers how to keep decisions moving.

Why one licensed contractor

Mr Build Co. has worked as a design-build general contractor since 1984 and holds California license #439166, which you can confirm with the Contractors State License Board. On an Irvine project we handle design, engineering, HOA and city approvals, trades, inspections and the final walkthrough, with a dedicated project manager as your single point of contact. The work follows our five steps, beginning with a free on-site consultation.

Our process

How a project with Mr Build works

Five steps, one team and one point of contact from the first visit to the final walkthrough.

  1. Consultation

    We meet at your home, walk the space, and talk through goals, priorities and budget before anything is drawn.

  2. Design & Permits

    Plans, engineering and energy calculations are prepared and submitted, and we handle plan-check corrections with the city.

  3. Selections

    You choose finishes, fixtures and materials with our guidance, so long-lead items are ordered before they can hold up the schedule.

  4. Construction

    A dedicated project manager runs the trades, inspections and schedule, with regular updates so you always know what's next.

  5. Final Walkthrough

    We walk every room with you, finish the punch list, close out the permit, and hand over warranties and manuals.

Client reviews

What our clients say

★★★★★

“Mr Build handled our complete home remodel from start to finish. Communication was excellent, the workmanship was high quality, and every room now feels more modern, comfortable, and functional.”

Michael S.Studio City, CA
★★★★★

“Mr Build transformed our outdated kitchen into a beautiful, functional space. The team was professional, organized, and kept us updated throughout the project. The finished kitchen exceeded our expectations.”

Jennifer L.Los Angeles, CA
★★★★★

“We hired Mr Build for our bathroom remodel and couldn't be happier with the results. They helped us improve the layout, choose great finishes, and completed everything with impressive attention to detail.”

David R.Encino, CA

FAQ

General Contractor in Irvine: common questions

What does a general contractor coordinate on an Irvine project?

Design and engineering, HOA architectural submittals, city permits and plan check, every trade from demolition to paint, inspections, material orders and the schedule. In Irvine the GC also manages association logistics such as contractor registration, insurance certificates, work hours and parking. You make the design and budget decisions; the GC turns them into a sequenced plan and builds it.

Do I need HOA approval before pulling permits in Irvine?

For exterior work, usually yes. Most associations want to approve windows, doors, roofing, additions, solar placement, paint colors and hardscape before construction, and many expect approval before the city permit is issued. Interior-only work often needs no design approval but may still require notice to the association. Check your CC&Rs and the association's alteration rules.

How do I verify a contractor's license in California?

Search the contractor's name or license number on the Contractors State License Board site at cslb.ca.gov. Confirm the license is active, the classification fits the work, and bonding and workers' compensation are current. Mr Build Co. holds California contractor license #439166. Many Irvine associations also require the contractor's license and insurance documents before work starts.

Can a general contractor help with plumbing that keeps leaking?

Yes. Many Irvine homes built in the 1970s through the 1990s have original supply piping reaching the end of its life, and recurring leaks are often a sign the whole system should be replaced rather than patched. A repipe routes new lines through attics and walls, avoiding the slab, followed by drywall repair and paint. It pairs well with a remodel because walls are already open.

Should I combine several projects into one contract?

When the work overlaps, usually yes. A kitchen, two bathrooms, new flooring and a repipe share demolition, rough-in, inspections and cleanup. Combining them under one contract and one permit set typically shortens the total schedule and avoids reopening finished work. Projects in unrelated parts of the house can be phased if budget or timing requires it.

From the blog

Helpful reading

Homeowner and contractor comparing kitchen tile samples on a countertop during a site meeting

Construction & PlanningOctober 19, 2026

How to Communicate With Your Contractor During a Remodel

Good contractor communication is a system, not a personality match: one contact on each side, a set meeting, written summaries and signed change orders. Here is how to set it up.

Free estimate

Let's talk about your home

Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.

  • On-site visit with an experienced builder
  • Clear written scope and pricing
  • Design, engineering and permits handled for you

Prefer to call? 888-792-8453

Get Free Estimate

We reply within one business day. No obligation.
Call nowGet Free Estimate