
Do You Need a Permit for a Kitchen Remodel in Los Angeles?
Cosmetic updates usually skip the permit. Anything that touches structure, plumbing, gas or wiring needs one from LADBS. Here is how to tell which path your kitchen takes.
Mr Build Co. Blog
Kitchen layouts, island sizing, lighting plans, pantry design, remodel timelines and permits in Los Angeles, explained by a design-build contractor.

Cosmetic updates usually skip the permit. Anything that touches structure, plumbing, gas or wiring needs one from LADBS. Here is how to tell which path your kitchen takes.

The best pantries are shallow, well lit and organized around how you cook. Here are layouts that work in real houses and the measurements to give your builder.

An open kitchen succeeds or fails on three things you can't see in the photos: the wall's structure, the range hood and the storage you lose. Here is how to plan all three.

One-wall, galley, L, U, G, island or open plan: the right kitchen layout depends on your room's footprint, where the plumbing and gas sit and how many people cook at once.

Light every work surface first, then add ambient and accent layers on separate dimmers. Here is how to space recessed lights, hang pendants and lock the plan in before cabinets go in.

A kitchen remodel usually means 2 to 16 weeks of construction, plus weeks or months of design, permits and ordering before demolition. Here is what happens in each phase and what slows it down.

Island size starts with the aisles around it, not the island itself. Here are the standard dimensions, the clearance math and the checks a builder makes before cabinets are ordered.
Free estimate
Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.
Prefer to call? 888-792-8453