The Design-Build Process: What Happens at Each Step

Design-build puts design, permits and construction under one contract. Here is what happens in each phase, what you decide and when, and how to tell if it suits your project.

Modern two-story home after a design-build renovation with new windows, updated siding and a refreshed entry
In this article
  1. How the design-build process differs from design-bid-build
  2. The five phases of the design-build process
  3. What you decide, and when
  4. Common contract structures
  5. Who is responsible for what
  6. When design-build fits, and when it does not
  7. How to vet a design-build firm
  8. How Mr Build runs the design-build process

The design-build process puts design and construction under one contract and one team, so the people drawing your project are the same people pricing and building it. On a home project it usually runs in five phases: consultation and feasibility, design and permits, selections and final pricing, construction, and a final walkthrough. Because the builder prices the design as it develops, budget problems show up on paper instead of in the middle of framing.

This guide explains what happens in each phase, what you decide along the way, how the contracts usually work, and when design-build is or is not the right choice for a remodel, addition or new home in Los Angeles or Orange County.

How the design-build process differs from design-bid-build

In the traditional route, called design-bid-build, you hire a designer or architect to complete drawings, send those drawings to several contractors for bids, and then sign a separate construction contract. Each handoff is a point where cost assumptions and design intent can drift apart.

QuestionDesign-buildDesign-bid-build
How many contracts?One, with the design-builderTwo or more: designer, then contractor
Who checks cost during design?The builder, continuouslyUsually nobody until bids come in
When do you know the price?Progressively, firm once selections are madeAfter drawings are finished and bid
Who solves field problems?The same team that drew the plansContractor and designer, sometimes in dispute
ScheduleDesign, pricing and ordering overlapEach step waits for the one before it

Large studies of construction projects in the United States have generally found that design-build delivers faster, with less schedule growth, than the traditional method. Those studies mostly cover commercial and public work, and they tie the best results to experienced teams and owners who stay involved. The method helps; it does not guarantee anything on its own.

The five phases of the design-build process

Every firm names its steps a little differently, but residential design-build follows the same logic. Here is what each phase involves and what you are asked to decide.

1. Consultation and feasibility

The process starts on site. The builder walks the property, looks at existing conditions, and talks through your goals and budget. For a remodel, that means checking framing, electrical panel capacity, plumbing routes and anything that may limit the layout. For an addition, ADU or new home, it includes setbacks, height limits, easements, slope and utility locations.

Your job in this phase is to be specific. List what the project must include, what would be nice, and the budget you do not want to exceed. Vague goals here tend to turn into redesigns later.

2. Design, engineering and permits

The design team develops layouts while the construction side prices them. If a layout pushes past your budget, you hear about it before the drawings are finished. Once the layout is approved, the plans are developed into a permit set with structural engineering, Title 24 energy calculations and any other reports the city requires.

Plans then go to plan check. In Los Angeles, Brentwood, Encino and Pacific Palisades that is LADBS, with LA City Planning involved when zoning review applies. Beverly Hills, Irvine, Santa Ana and the other cities in the region have their own building departments. Coastal properties may need a Coastal Development Permit, and many Newport Coast homes need HOA approval as well. Expect at least one round of corrections on most projects.

3. Selections and final pricing

This is where you choose cabinets, tile, plumbing fixtures, appliances, windows, flooring and lighting. Selections affect more than looks: a range with a larger hood, a freestanding tub or a heavier stone countertop can change electrical, plumbing or framing work.

Once selections are made, the scope and price can be fixed in writing. Items with long lead times, such as custom windows, cabinetry or specialty tile, should be ordered now so they arrive before the crew needs them.

4. Construction

Construction follows the approved plans, with inspections at each stage: foundation or underfloor, framing, rough plumbing, electrical and mechanical, insulation, and drywall where required. Because the design team is still involved, questions from the field get answered quickly instead of waiting on a formal request to an outside office.

Your role shifts to approving any changes and reviewing progress. When a change is needed, because of a hidden condition or your own request, it should be priced and approved in writing before the work happens.

Agree at the start on how you will get updates: a regular call or meeting, a shared schedule, photos of work that is about to be covered. Clear communication habits matter more on a design-build job than the contract form, because you are trusting one team with both the drawings and the execution.

5. Final walkthrough and closeout

Near the end, you walk the project with the builder and build a punch list of anything that needs adjustment or touch-up. The final inspection closes the permit. You should receive warranties and manuals for equipment and fixtures, plus records of what was installed.

What you decide, and when

Most frustration in design-build comes from decisions made too late. This table shows where the big decisions fall.

PhaseDecisions that are yours
ConsultationMust-haves, budget ceiling, rough timing, whether you will live in the home during work
Design and permitsLayout, room sizes, window locations, structural changes, exterior look
SelectionsEvery finish, fixture and appliance, ideally before construction starts
ConstructionResponses to hidden conditions, any changes you request
CloseoutPunch list sign-off

The window for changing your mind cheaply is the design phase. Moving a wall on paper costs an afternoon of drafting. Moving it after framing costs labor, material and inspection time.

Common contract structures

Design-build contracts for homes usually take one of a few forms:

  • Fixed price. A set price for a defined written scope, agreed once design and selections are complete. Changes are priced separately.
  • Phased agreement. A separate, smaller agreement covers design and permits. The construction price is fixed once the plans and selections are done.
  • Guaranteed maximum price. Costs are tracked against a ceiling the builder commits to.
  • Cost-plus. You pay actual costs plus a fee, with less price certainty and more transparency into each cost.

Each spreads risk differently. Our article on cost-plus vs. fixed-price contracts covers the trade-offs in detail. Whatever the form, the written scope should be detailed enough that you and the builder would describe the finished project the same way.

Who is responsible for what

The design-builder is responsible for coordinating design and construction, which is the main reason people choose it. Some firms keep designers on staff; others work with partner architects and engineers under the same contract. Either way, you have one company to call.

In California, anyone contracting for construction work over a small threshold must hold a contractor license, and you can check a license and its history on the Contractors State License Board site. Structural engineering is done by licensed engineers, and stamped drawings are required wherever the city asks for them.

You remain responsible for timely decisions, approvals at each milestone and payments on the agreed schedule. Design-build rewards owners who stay engaged; it does not run on autopilot.

When design-build fits, and when it does not

Design-build tends to work well for:

  • Whole-home remodels where structural, mechanical and finish work all overlap
  • Kitchens and bathrooms where layout, plumbing and cabinetry depend on each other
  • Additions and ADUs on tight lots where site constraints shape the design
  • Rebuilds where speed matters, including homes in Pacific Palisades being rebuilt after the January 2025 fire, where owners should confirm current rebuild rules with LADBS

It is a weaker fit when you want an independent architect checking the builder's work throughout, when the design itself is the main goal and schedule is secondary, or when you want competitive bids on a finished set of drawings. Our comparison of design-build vs. hiring an architect walks through that choice.

How to vet a design-build firm

  1. Check the license. Confirm the license number, status and classification with the CSLB.
  2. Ask for similar work. A firm that builds new homes may approach a small bathroom differently than a remodeling specialist, and the reverse is also true.
  3. Ask who manages your job. Find out who your day-to-day contact will be and whether that person stays through closeout.
  4. Read a sample scope. A good scope names materials, quantities and responsibilities, not just room names.
  5. Understand change orders. Ask how changes are priced and approved, in writing and before work proceeds.
  6. Clarify the design phase. Ask what you receive if you stop after design, and who owns the plans.

How Mr Build runs the design-build process

Mr Build has worked as a design-build general contractor in Southern California since 1984, with more than 130 homes transformed and 50+ ADUs delivered. Our process follows five steps: Consultation, Design & Permits, Selections, Construction and Final Walkthrough. Design, architectural plans, engineering, permits and approvals are handled in-house through our partners, so you are not coordinating separate firms.

It starts with a free on-site consultation. After design and selections, you receive a fixed, detailed written scope and pricing, and a dedicated project manager runs the job through the final walkthrough. Learn more about our complete home remodeling and custom home services, or see how we work as a general contractor in Brentwood. When you are ready, schedule your free consultation.

Sources and further reading

FAQ

Frequently asked questions

How long does the design-build process take for a home project?

It depends on scope and permits more than on the delivery method. A kitchen or bathroom remodel may move from first meeting to construction in a few months, while an addition, ADU or new home often spends longer in design and plan check. Design-build can shorten the overall timeline because pricing, engineering and design happen together instead of one after another, and long-lead items get ordered earlier.

Does design-build cost more than hiring an architect and a contractor separately?

Not necessarily. You are paying for the same design, engineering and construction work, just under one contract. The savings usually come from fewer redesigns, because the builder prices the drawings as they develop, and from fewer change orders caused by gaps between plans and site conditions. Competitive bidding on a finished set of drawings is lost, so compare the detail of each written scope, not just the total.

Who owns the plans in a design-build contract?

The contract decides that, so read it before signing. Some design-build agreements let you buy or take the drawings if you part ways after the design phase; others keep them with the firm unless you proceed to construction. Ask how design work is priced, what you receive if you stop after permits, and whether the plans can be used by another contractor.

Can design-build work for a kitchen or bathroom remodel?

Yes, and it often works well there. Kitchens and bathrooms involve many trades in small spaces, plus selections that affect plumbing, electrical and cabinet layout. Having the same team draw the layout, price it, pull the permit and build it reduces the back-and-forth that slows smaller projects. It also means one company answers your questions when something unexpected turns up behind a wall.

From the blog

Keep reading

Homeowner and contractor comparing kitchen tile samples on a countertop during a site meeting

Construction & PlanningOctober 19, 2026

How to Communicate With Your Contractor During a Remodel

Good contractor communication is a system, not a personality match: one contact on each side, a set meeting, written summaries and signed change orders. Here is how to set it up.

Floor-to-ceiling plastic containment wall with a zipper door sealing off a kitchen remodel

Construction & PlanningOctober 14, 2026

Can You Live at Home During a Remodel? How to Decide

Many families can stay home during a remodel if the work is contained and a kitchen and bathroom stay usable. Here is how to decide, what to require from your contractor and when to move out.

Free estimate

Let's talk about your home

Share a few details and we'll set up a visit. We'll look at the space, listen to what you want, and explain how permits, schedule and budget would work for your project.

  • On-site visit with an experienced builder
  • Clear written scope and pricing
  • Design, engineering and permits handled for you

Prefer to call? 888-792-8453

Get Free Estimate

We reply within one business day. No obligation.
Call nowGet Free Estimate